The first party intends to upgrade and transform the existing warehouse into an efficient three-dimensional warehouse, with a data-driven and intelligent management of the entire process of material entry and exit. Based on its own product advantages and industry experience, Jinshi has integrated its hardware advantages and software technology capabilities to design a complete three-dimensional warehouse solution.
● Storage capacity: 1392
● Cargo weight: 1000kg
● Horizontal movement speed: 160m/min
● Vertical movement speed: 30/45m/min
● In/out efficiency: 20 times per hour
The fastest delivery time is 2 months
Traditional three-dimensional warehouses require a delivery time of 6-10 months. Jinshi has independently developed a drive control integrated containerless control system, which greatly shortens the delivery time
Increase storage capacity by 20%
The traditional stacker crane has 9 layers, and Jinshi is driven by gears and racks. It has a servo motor without steel wire ropes and can stack up to 11 layers.
Energy saving of 40%
The Glink II industrial bus technology, which adopts independent technology, achieves a data exchange rate of milliseconds.
Due to the fast data exchange speed, the overall speed of the line is increased by more than 30% compared to traditional control methods, and the safety and reliability are also doubled.